Marek Landscaping has designed, built, consulted on and maintained an exceptional variety of projects. We focus on balancing aesthetics, ecology, engineering needs and budget to form cohesive and sustainable results. Please browse through our existing work and check back to see more current projects as we update weekly.
Stonework
Lighting
Fences & Gates
Holiday Decoration
Menomonee Valley Industrial Center and Community Park
Landscape Consultation & Construction
Location: Milwaukee, WI
Construction Timeline: October 2005 December 2007
This 120 acre site is situated in an abandoned industrial and railway corridor along Canal St near Miller Park in the city of Milwaukee along the Menomonee River. Marek’s work began along the River where we performed erosion control measures in the watercourse and planted native trees and seed in conjunction with earthwork crews. This urban river is flashy and restoration work was performed directly behind earthwork crews to minimize the chance of sediment being released into the waterway. This work was performed in the fall and winter of 2005. Marek did 80 acres of seeding work for erosion control of the development parcels to the West. Beginning in the summer of 2006 Marek began the landscaping work for the rest of the park which included 5 acres of soccer fields, 7 acres of native seeding in the stormwater treatment train, 10,000 emergent aquatic plantings, more than 400 trees and 500 shrubs. All work was completed within the construction schedule. Marek was awarded a competitive bid and qualification contract for the ongoing maintenance of the project. This included maintenance planning, scheduling, and costing for the park for the next three years.
Gallery
Indian Creek
Landscape Construction
Location: Fox Point, WI
Construction Timeline: July 2007 November 2007
This MMSD watercourse rehabilitation project involved the removal of a concrete channel liner, bank stabilization, culvert placement, retaining wall construction, and tree planting work along this urban creek. Marek’s work involved 5 acres of native seeding, 7 acres of low maintenance turfgrass seeding, 18 native plant pods, two hundred large shade trees, 2,300 sq ft of modular retaining wall construction, and the installation of guardrails. This work took place in strict accordance with DNR regulations and permit conditions while the channel was active. Marek is responsible for the ongoing maintenance of the native plantings for the next five years.
Gallery
The Villa Terrace Decorative Art Museum Garden Renovation
Location: Milwaukee, WI
Construction Timeline: 2000 2002
Construction & specification involved; restoring & constructing all stone walkways, patios, steps, & dry-stacked walls; regrading & planting the terraced slope and lower garden; relocating, storing, & replacing statues; restoring the water stairway and fish pond; restoring fountains; placing stone benches, pots, and garden ornaments; designing & constructing entrance walkway; assisting the lighting design & installation; installing on-site utilities; installing the wrought iron fence; and ordering & installating of plant and landscape materials.
Villa Terrace Gallery
River Revitalization Foundation
Trail Consultation and Construction
Location: Milwaukee, WI
Construction Timeline: Summer 2006
This one mile low impact trail was specified and constructed by Marek in cooperation with Milwaukee County Parks and River Revitalization Foundation. It is a 4’ gravel trail constructed partly within the limits of the wetlands and through endangered Butler Gartersnake habitat. One bridge, spanning an MMSD outfall structure and several retaining walls were constructed in tight quarters and steep slopes. Permit restrictions were strict and the budget was tight. Marek completed the trail on schedule and on budget. In kind donations of materials from our vendors, labor from subcontractors, and equipment from suppliers totaled $25,000. Marek worked in conjunction with federal Americorps troops and helped coordinate their work and training. The restoration of the sides of the trail entailed a wet mesic native prairie planting and erosion stabilization.
Gallery
Kinnickinnic River Woody Species Removals
Landscape Management and Clearing
Location: Milwaukee, WI
Construction Timeline: November - December 2006
This MMSD watercourse rehabilitaion project included three reaches of the Kinnickinnic River spanning from North 20th and Cleveland Avenue to North 35th and Forest Home Avenue. This project involved the removal of woody debris and spot herbicide treatment along the corresponding concrete channel with very limited access and regulations. This work took place in strict accordance with DNR regulations and permit conditions while the channel was active.
Gallery
Lincoln Center of The Arts
Location: Lincoln Center of the Arts, Milwaukee Public Schools
Design and Engineering Timeline: Winter 2004-Current
Construction Timeline: Spring 2007-depending on funding
In redesigning the lot Marek sought to improve traffic flow, incorporate an outdoor classroom, manage on site storm water, and create a universally accessible entrance that welcomes visitors into the main entrance of the historic building. Resident artist (Tom Ratkowski) located in LCA, created a scale model of the proposed design and Dave Sether from Marek created a 3D sketchup rendering to help in visualization.
Lincoln Center of The Arts Gallery
Private Residence
Landscape Design & Construction
Location: Mequon, WI
Design & Engineering Timeline: Winter 2001
Construction Timeline:Hardscape Autumn/Winter 2001
Softscape Spring 2003
The project involved the design and construction of soft and hardscapes for the craftsman, prairie-style home. The site is located along the Lake Michigan shoreline with an unstable 140-foot bluff.
Gallery
Private Residence
Bluff Stabilization
Location: Grafton, WI
Design Timeline: Winter 2003
Construction Timeline: August 2004
Marek Landscaping, LLC worked with a civil & geotechnical engineer to design the bluff stabilization plan, prepared & submitted construction permits to state and local agencies, and attended public hearing meetings on behalf of the client. By working with WDNR staff, it was determined that a Chapter 30 and U.S. Army Corp of Engineers permits were not necessary.
Gallery
Private Residence
Dry Stacked Wall & Fountain
Location: Fox Point, WI
Design Timeline: July 2004
Construction Timeline: Autumn 2004
Marek Landscaping, LLC was brought into this project when the new owners of this secluded ravine homesite asked to address a failing concrete retaining wall. The wall supports a 70+-foot slope, is located directly behind the home, and commands views from several rooms in the house.
Gallery
Private Residence
Landscape Design & Construction
Location: Whitefish Bay, WI
Design Timeline: Winter 2003
Construction Timeline: Summer 2004
The project involved the design and construction of soft and hardscapes on a historic homesite that is shaded by several trees. The site is located along the Lake Michigan shoreline with beautiful vistas of the shoreline to the north. The client sought to update the landscape, increase their privacy, and improve views of Lake Michigan.
Gallery
Private Residence
Stair Design & Construction
Location: Beechwood, WI
Design Timeline: May 2005
Construction Timeline: August/September 2005
Marek was contracted to collect stone from the property with as little impact as possible to the trail system, woodland, and prairie. Using tracked equipment and a variety of rigging techniques stone steps weighing between 11,000 and 500 pounds were collected without a trace of damage to woodland or prairie. The clients saved 90% on these material costs.
Gallery
Private Residence
Landscape Design & Construction
Location: Milwaukee, WI
Design Timeline: July 2005
Construction Timeline: October 2005 August 2006
With this project, Marek Landscaping was hired to help with renovating the driveway in correlation with Community Builders and Restoration. The owners were looking for a complimentary match with their existing home to aid in the overall appeal of their property. In this instance we used a running bond brick pattern with custom cut corner details and a horizontally opposed connecting patio.
Gallery
The Garden Room
Roof Garden
Location: Shorewood, WI
Construction Timeline: May June 2002
The Garden Room is a shop specializing in garden tools, fountains, landscape ornaments, and antiques.
Garden Room Gallery
Trocadero Cafe
Fountain & Sidewalk
Location: Milwaukee, WI
Design Timeline: Spring 2003
Construction Timeline: Spring 2003
Marek Landscaping, LLC designed and constructed the placement of reclaimed red pavers along the sidewalk and a fountain centerpiece in the dining patio.
Trocadero Cafe Gallery
Private Residence
Prairie Restoration
Location: Ottawa, WI
Construction Timeline: May June 1997
Client sought to restore a 2 Acre "old field" into a prairie.
Gallery
|
 |